BLUEWAVE is plug & play and is connected in three steps:
- Measure: Determine the supply points by exactly measuring the network load
- Install: Select a current transformer and connect BLUEWAVE
- Configure: BLUEWAVE can be commissioned with just a few clicks
The current transformers can be installed on the mains or load side. A special feature: Up to five BLUEWAVE units can be used parallel to increase the compensation current. In parallel operation, the current transformers are connected on the load side.
BLUEWAVE's design is as simple and compact as possible and is easy to use. Nonetheless, professional service before, during, and after installation is very important. Our sales partners ensure this. BLUEWAVE can be commissioned without any problems, so they can concentrate on finding the optimum configuration for your requirements.
Thesaurus terms linked with the page
- Installation
- Installieren
- Konfigurieren
- Lastseite
- Messen
- Plug Play
- Vertriebspartner